Question no 2019 : Scheduling Indicator in Maintenance Plan

In SAP PM ECC6.0, which of the following scheduling indicator for example allows you to schedule the maintenance call every 30 days on the 30th day of the month ?

(only one answer)

A)    Time based.
B)    Time based by key date.
C)    Time based by factory calendar.
D)    Performance based.
E)    Cycle set.
.

3 comments:

  1. The Time-based by Key date selection in the Header of the Maintenance Plan (scheduling folder) allows you to have the Maintenance Calls to fall on specific date interval, for example every 30th of the month.

    ReplyDelete
  2. C) Scheudling using the Factory Calendar will count the due date respecting the non-working days in the Factory Calendar.

    ReplyDelete