Question no 3145 : LTP Planning Scenario

In SAP PP LTP (Long Term Planning) as at ECC6.0 EhP6, which of the following control parameters can be set in the Long Term Planning Scenarios ?

(more than one answers)

A)   Opening Stocks.
B)   Firmed Receipts.
C)   Switch off Direct Production.
D)   Switch Consumption-Based Material to Dependent Requirements.
E)   Routing Group and Counter.
.