In SAP PP as at ECC6.0 EhP6, which of the following existing master data can be referred to by the Long Term Planning scenario during the LTP planning run ?
(more than one answers)
A) Material Master.
B) Work Center.
C) BOM.
D) Routing.
E) Production version.
.
(more than one answers)
A) Material Master.
B) Work Center.
C) BOM.
D) Routing.
E) Production version.
.
LTP is similar in many aspects to MRP, some master data can be controlled via the scenario, eg: switch on or off lot sizing, MTO etc. However, the standard master data already setup for MRP can be used in LTP.