In SAP as at ECC6.0 EhP6, Work Center or Resources can used for which of the following assignments for scheduling purpose ?
(more than one answers)
A) Maintenance Task List.
B) Service Entry Sheet.
C) Routing.
D) Rate Routing.
E) Recipe.
.
(more than one answers)
A) Maintenance Task List.
B) Service Entry Sheet.
C) Routing.
D) Rate Routing.
E) Recipe.
.
Answer: A, C, D, E
ReplyDeleteWork Center master in different modules are similar in design.
ReplyDeleteIt can be assigned to the following:
. Standard Routing (for PPDI Production Orders)
. Rate Routing (for PPDI Repetitive)
. Recipe (for PPPI) but it is called Resources
. Network operations (PS)
. Maintenance Task List (PM/CS)
. Inspection Plan (QM)