In SAP PPPI and PPDI as at ECC6.0 EhP6, which of the following PP master data can be assigned to the Production Version ?
(more than one answers)
A) Bill of Material.
B) Standard Routing.
C) Rate Routing.
D) Rough Cut Capacity Profile.
E) Recipe.
.
(more than one answers)
A) Bill of Material.
B) Standard Routing.
C) Rate Routing.
D) Rough Cut Capacity Profile.
E) Recipe.
.
Rough Cut Capacity Profile is only used in Sales and Operations Planning.
ReplyDelete