In SAP MM as at ECC6.0 EhP6, if several subcontractors require different components to be supplied to them for producing the same product, what method can you suggest so that the correct BOM alternative's components are exploded into the subcontracting purchase order ?
(only one answer)
A) Setup Production Version in the Material Master and assign it to the Purchasing Info Record.
B) Setup Production Version in the Material Master and assign it to the Source List.
C) Setup Production Version in the Material Master and assign it to the Vendor Master.
D) Setup Production Version in the Material Master and assign it to the Manufacturer Part List.
E) Setup Production Version in the Material Master and assign it to the Vendor Part List.
.
(only one answer)
A) Setup Production Version in the Material Master and assign it to the Purchasing Info Record.
B) Setup Production Version in the Material Master and assign it to the Source List.
C) Setup Production Version in the Material Master and assign it to the Vendor Master.
D) Setup Production Version in the Material Master and assign it to the Manufacturer Part List.
E) Setup Production Version in the Material Master and assign it to the Vendor Part List.
.
Answer: A
ReplyDeleteBOM usage and Alternative can be assign to Production Version in Material Master MRP4 view.
ReplyDeleteThe Production Version can be assign to the Purchasing Info Record.
See link:
http://cwwongsap.blogspot.com/2015/04/mm-purchasing-for-subcontracting.html