In SAP PM/CS as at ECC6.0 EhP6, you can use the serial number profile to control which of the following business process ?
(more than one answers)
A) Serial number to be generated when a new purchase order is saved.
B) Mandatory equipment creation at the point of goods movement.
C) Synchronization of equipment and asset creation at goods receipt.
D) If serial number must be generated at the point of goods movement.
E) If Serial number must be the same as the equipment number.
.
(more than one answers)
A) Serial number to be generated when a new purchase order is saved.
B) Mandatory equipment creation at the point of goods movement.
C) Synchronization of equipment and asset creation at goods receipt.
D) If serial number must be generated at the point of goods movement.
E) If Serial number must be the same as the equipment number.
.
Answer: A, B, D
ReplyDeleteC) Equipment-Asset link/synchronization is configure in IMG-FI-Asset Accounting and not the serial number profile (as at ECC6.0 EhP6)
ReplyDeleteE) Serial level in the Plant/Storage view of the material master controls the synchronization of equipment and serial number, not via the serial number profile.
ReplyDelete