In SAP PM/CS as at ECC6 EhP6, which of the following can be assigned to Reference Functional Location ?
(more than one answers)
A) Construction Type.
B) Permit.
C) Reference Measuring Point.
D) Cost Center.
E) Equipment.
.
(more than one answers)
A) Construction Type.
B) Permit.
C) Reference Measuring Point.
D) Cost Center.
E) Equipment.
.
Answer: A, C
ReplyDelete