In SAP MRP as at ECC6.0 EhP6, which of the following determine the display of the screen sequence at the Header of the S/R list ?
(only one answer)
A) Material Type.
B) MRP Controller.
C) Material Group.
D) MRP Profile.
E) MRP Type.
.
(only one answer)
A) Material Type.
B) MRP Controller.
C) Material Group.
D) MRP Profile.
E) MRP Type.
.
Answer: E
ReplyDeleteIMG - PP - MRP - Evaluation - Define screen sequence for header details