Question no 3300 : Creation Indicator in MRP Group

In SAP MRP as at ECC6.0 EhP6, what is the purpose of the "Creation Indicator" parameter in the MRP Group configuration for MM and PP MRP ?

(only one answer)

A)  Default the Purchasing Processing time.
B)  Parameters for the setting of NETCH and NETPL.
C)  Default Purchase Requisition document type.
D) Indicators in MRP planning run screen for creation of PR, Delivery Schedule, and MRP List.
E) Tolerance values for creation of exception messages in the S/R list.
.

1 comment:

  1. Answer: D

    Creation indicator for PR, Planned Order, PR in opening period.
    Creation indicator for MPR list, no MRP list, or dependent on Exception Messages.
    Creation indicator for Delivery Schedule, Planned Order, DS in opening period.