In SAP MM or PP as at ECC6.0 EhP6, the Material Master MRP4 Storage Location data section view can be used for which of the following feature ?

(more than one answers)

A)  Set the Storage Location of a material not for MRP Planning.
B)  Ensure Goods Receipt possible for a material possible for the Storage Location.
C)  Define the Storage Location for separate MRP Planning.
D)  Define an MRP type for the Storage Location level.
E)  Assign to the Warehouse.
.

1 comment:

  1. Answer: A, B, C

    Usually it is used to set the SLoc not planned or planned separately. However, extending the material to the SLoc level also is used to allow material to be GR into the SLoc (especially when in MM-IM IMG the create SLoc automatically is de-activated.)