Question no 3221 : Quota Arrangement features for PP MRP

In SAP PP MRP as at ECC6.0 EhP6, which of the following features cannot be configured in the Quota Arrangement ?

(only one answer)

A)   Split of PIR for multiple Production Versions.
B)   Controlling Maximum Release Qty for each Production Version per period.
C)   Uses the Quota Rating to allocation Production Qty to Production Version.
D)   Allocate Qty to Stock Transfers from Production Plant to Distribution Centers.
E)   Optimally select Production Version based on Lowest Cost.
.