In SAP PP or PPPI as at ECC6.0 EhP7, the Costing with Quantity Structure uses which of the following for Planned Cost Calculation ?
(more than one answers)
A) BOM and Standard Routing.
B) Recipe.
C) Based Planning Object.
D) Inspection Plan
E) BOM and Rate Routing
.
(more than one answers)
A) BOM and Standard Routing.
B) Recipe.
C) Based Planning Object.
D) Inspection Plan
E) BOM and Rate Routing
.
Answer: A, B, E
ReplyDeletefor PPDI Production Order based it will be BOM and Standard Routing
ReplyDeletefor PPDI Repetitive based it will be BOM and Rate Routing.
for PPPI Process Order based it will be Recipe.