In SAP PP ECC6.0, Backflushing can be setup using which of the following method ?
(more the one answers)
A) Material master MRP2 view.
B) Work center.
C) BOM item detail.
D) Component assignment to operation in the Routing.
D) Routing header.
.
(more the one answers)
A) Material master MRP2 view.
B) Work center.
C) BOM item detail.
D) Component assignment to operation in the Routing.
D) Routing header.
.
A) The Material Master MRP 2 view has a Backflushing indicator, you have two options:
ReplyDelete. Always Backflush
. Depend on Work Center
B) The Work Center has a backflushing indicator so that when it is assign to the operation of a Routing, the materials assigned to it are to be backflush.
ReplyDeleteD) If Material master and Work center are not set with backflushing indicator, then when the component is assigned to the Routing operation, the backflushing indicator can also be set.
ReplyDelete