In SAP PP/CO ECC6.0, in order to control a material for product cost estimate calculation, especially for new product development until mass production, which of the following is your recommendation ?
(only one answer)
A) Use the correct material type.
B) Do not create the Bills of Material and Routing until mass production begins.
C) Do not create the Costing view of the material master until mass production begins.
D) Assign an appropriate material status to the material master.
E) Set the item status in the BOM to control the "costing relevancy".
.
(only one answer)
A) Use the correct material type.
B) Do not create the Bills of Material and Routing until mass production begins.
C) Do not create the Costing view of the material master until mass production begins.
D) Assign an appropriate material status to the material master.
E) Set the item status in the BOM to control the "costing relevancy".
.
Answer: A
ReplyDeleteYou can use a Material type during Product Develoopment where the Cost Estimate for Qty Structure is not set. When the Material is ready for Mass Production, switch to a Material type that allows Cost Estimate for Qty Structure, then perform the relevant Cost Estimate with Qty Structure to update the Cost to the Material Master getting ready for Mass Production. .
ReplyDeleteHowever if you like to temporarily disallow cost estimates, then you can assign a material status to the material master. Cost estimate is now allowed for the material until the material status is removed from the material master.