In SAP PP ECC6.0, if a raw material input quantity is 0.24689 gram to produce 1 kg of a finished product. The raw material was setup with base unit of measure as gram and purchasing unit of measure as kg. What is your recommended setup of the raw material in the BOM as SAP only allows 3 decimal places ?
(only one answer)
A) change the base uom to milligram and purchasing uom to gram.
B) retain the base uom as gram and change the purchasing uom to gram.
C) increase the base quantity in the BOM header to 100 kg or more.
D) change the uom of the raw material in the BOM to milligram.
E) round up the quantity to 0.247 gram.
.
(only one answer)
A) change the base uom to milligram and purchasing uom to gram.
B) retain the base uom as gram and change the purchasing uom to gram.
C) increase the base quantity in the BOM header to 100 kg or more.
D) change the uom of the raw material in the BOM to milligram.
E) round up the quantity to 0.247 gram.
.
Probably the optimal method is to retain the base uom for the raw material as Gram BUT to increase the base quantity for example to 100kg for the Header Bills of Material on the Finised Goods or Assembly.