In SAP PM as at ECC6.0 EhP6, Equipment Master has the following assignment relationships ?
(more than one answers)
A) More than one Permit can be assigned to an Equipment Master.
B) More than one multi-level BOM can be assigned to an Equipment Master.
C) More than one Sub-Equipment can be assigned to an Equipment Master.
D) More than one Measuring Point can be assigned to an Equipment Master.
E) More than one Material-Serial Number can be assigned to an Equipment Master.
.
(more than one answers)
A) More than one Permit can be assigned to an Equipment Master.
B) More than one multi-level BOM can be assigned to an Equipment Master.
C) More than one Sub-Equipment can be assigned to an Equipment Master.
D) More than one Measuring Point can be assigned to an Equipment Master.
E) More than one Material-Serial Number can be assigned to an Equipment Master.
.
Answer: A, C. D
ReplyDeleteB) There is only one field for Construction Type for both EQ and FL and therefore only one multi-level BOM.
E) EQ can be assigned to Material-Serial Number but only one is allowed for autonomous representation in both PM and MM.