In SAP PP as at ECC6.0 EhP6, which of the following objects can be assigned to an operation in a PP Routing ?
(more than one answers)
A) Document from Document Management System.
B) Inspection Characteristics.
C) Material Component from a BOM.
D) Production Version.
E) Work Center.
.
(more than one answers)
A) Document from Document Management System.
B) Inspection Characteristics.
C) Material Component from a BOM.
D) Production Version.
E) Work Center.
.
Answer: A, B, C, E
ReplyDeleteExcept PV.