In SAP MM or PP as at ECC6.0 EhP6, which of the following are pre-requisites for MRP run ?
(more than one answers)
A) MRP Area.
B) Plant activated for MRP run.
C) Valid MRP Type.
D) Material master Accounting data view.
E) Planning File Entry for the Material.
.
(more than one answers)
A) MRP Area.
B) Plant activated for MRP run.
C) Valid MRP Type.
D) Material master Accounting data view.
E) Planning File Entry for the Material.
.
Answer: B, C, E
ReplyDeleteA) MRP Area is optional
B) The Plant must be activated for MRP run in the IMG.
C, E) A valid MRP type in the MRP1 data view in the material master will generate a Planning File Entry for the Material.
D) Material Master Accounting view is not necessary, as "UNBW" can also be planned with a minimum of Purchasing and MRP data view.
Answer: B, C, E
ReplyDeleteA) MRP Area is optional
B) The Plant must be activated for MRP run in the IMG.
C, E) A valid MRP type in the MRP1 data view in the material master will generate a Planning File Entry for the Material.
D) Material Master Accounting view is not necessary, as "UNBW" can also be planned with a minimum of Purchasing and MRP data view.