In SAP PP as at ECC6.0 EhP7, Engineering Work Bench transaction CEWB can be used to create the following ?
(more than one answers)
A) Material Master.
B) BOM.
C) Routing.
D) Work Center.
E) Inspection Characteristics.
.
(more than one answers)
A) Material Master.
B) BOM.
C) Routing.
D) Work Center.
E) Inspection Characteristics.
.
Answer: A, B, C
ReplyDeleteD,E) as at ECC6.0 EhP7, tried creating Work Center and Inspection Characteristics, both are still not possible!