Question no 2792 : Overhead Calculation for Maintenace/Service Order

In SAP PM/CS as at ECC6.0 EhP6, Overhead Calculation is possible due to which of the following setup ?

(only one answer)

A)   Costing Sheet assigned to a Planning Plant.
B)   Costing Sheet assigned to a Maintenance Plant.
C)   Costing Sheet assigned to the Order type for a Planning Plant. 
D)   Costing Sheet assigned to the Costing Variant assigned to the Order type for a Maintenance Plant.
E)   Costing Sheet assigned to the Costing Variant assigned to the Order type for a Planning Plant. 
.

2 comments:

  1. In SAP PM/CS, Overhead cost calculation is referred to the Costing Sheet. And the Costing Sheet is configured within the Costing Variant. In the IMG, you assign the Costing Variant to an Order Type/Planning Plant combination.