In SAP PM as at ECC6.0 EhP6, the purpose of the following program is to _________________ .
(only one answer)
A) Re-valuate the Plan Costs.
B) Re-valuate the Plan Costs and Determine the Actual Overhead Costs.
C) Re-valuate the Plan Overhead Costs and Determine the Actual Overhead Costs.
D) Calculate the Actual Overhead Costs.
E) Determine Activity based cost to add as surcharge to the Order.
.
B) Re-valuate the Plan Costs and Determine the Actual Overhead Costs.
C) Re-valuate the Plan Overhead Costs and Determine the Actual Overhead Costs.
D) Calculate the Actual Overhead Costs.
E) Determine Activity based cost to add as surcharge to the Order.
.
Answer: D
ReplyDeleteIt is for actual overhead costs calculation.