In SAP PP ECC6.0 EhP6, you can use ________________ to determine the Strategy Group for a Material ?
(only one answer)
A) Material Type.
B) MRP Controller.
C) MRP Group.
D) Plant.
E) Industrial Sector.
.
(only one answer)
A) Material Type.
B) MRP Controller.
C) MRP Group.
D) Plant.
E) Industrial Sector.
.
Answer: C