In SAP MRP, assume the following current settings in the Quota Arrangement for a Material, choose the correct answers ?
(more than one answers)
A) The Quota Rating for vendor 1000 is 0.
B) The Quota Rating for vendor 1000 is 100.
C) The Quota Rating for vendor T-K500A20 is 50.
D) The next requirement will select vendor T-K500A20.
E) The next requirement will select vendor 1000.
.
Quota Rating for Vendor 1000 is 100. (0 + 100 / 1)
ReplyDeleteQuota Rating for Vendor T-K500A20 is 50. (100 + 0 / 2)
Source determination will select vendor T-K500A20 for the next requirement as the vendor has a lower Quota Rating.