This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Saturday, January 25, 2014

Question no 2268 : Material Specification

In SAP QM, you cannot perform and enter the following in the Material Specification ?

(more then one answers)

A)     Inspection Point.
B)     Inspection characteristics data without the Master Inspection Characteristics.
C)     Sampling Procedure.
D)     Dynamic Modification Rule.
E)     Apply Engineering Change Number.
.

4 comments:

  1. A,D) The Material Specification do not have a header and therefore the Inspection Point and DMR is not possible at the header.

    ReplyDelete
  2. B) Unlike the Inspection Plan; the Material Specification only allows you to assign the Master Inspection Characteristics. While the Inspection Plan allows you to assign the MIC and enter the inspection characteristics control parameters directly without referring to an MIC.

    ReplyDelete
  3. E) One of the disadvantages of the Material Specification is that Engineering Change Management is not possible.

    ReplyDelete

Note: Only a member of this blog may post a comment.