In SAP QM, the technical delivery terms for a material are stored in the _____________________and can be included in a RFQ send to the vendor.
(only one answer)
A) Material Master QM data view.
B) Document Management System.
C) Quality Level.
D) Inspection Plan.
E) Inspection Method.
.
(only one answer)
A) Material Master QM data view.
B) Document Management System.
C) Quality Level.
D) Inspection Plan.
E) Inspection Method.
.
Answer: B
ReplyDeleteThe Document type QD1 and QD2 are used for storing documents for technical delivery terms for QM Procurement Sourcing.
ReplyDelete