In SAP PM ECC6.0, which of the following can be assigned as PRTs to an operation in the maintenance task list ?
(more then one answers)
A) Equipment PRT.
B) Material PRT.
C) Miscellaneous PRT.
D) Document PRT.
E) Measuring Point.
.
(more then one answers)
A) Equipment PRT.
B) Material PRT.
C) Miscellaneous PRT.
D) Document PRT.
E) Measuring Point.
.
As at ECC6.0 EhP4, Measuring Points can be assigned as PRT to the maintenance operations for purpose of Inspection Rounds.