Question no 2252 : Maintenance Item Scheduling

In SAP PM/CS ECC6.0, If a Maintenance Item is registered with multiple technical objects (example: 3 equipment), what is expected of the scheduling results when maintenance is due for the Maintenance Item ? (assuming that the task list contains 3 operations and the call object is a maintenance order)

(only one answer)

A)   3 maintenance order is generated, one for each equipment.
B)   1 maintenance order is generated with 9 operations for the 3 equipments.
C)   1 maintenance order is generated with 3 operations with the original time from the task list for the 3 equipments.
D)   1 maintenance order is generated with 3 operations with the (original time x 3) from the task list for the 3 equipments.
E)   3 maintenance order is generated, one for each equipment provided a configuration is set for the maintenance category used to create the maintenance plan. 