Question no 1867 : MRP List vs S/R List

In SAP MM and PP ECC6.0, evaluate the correctness of the following statements, which are true ?

(more than one answers)

(A)   The main difference between the MRP list and the Stock Requirements list is that each time the MRP list is called up, the system re-reads the various MRP elements and displays the most up-to-date situation of the material concerned.
(B)   In an organization, MRP run is carried out weekly. The planner did not evaluate the MRP run results processed last week Friday. Urgent deliveries and goods receipt were carried out during the week end. MRP list would provide to the planner the static results of the previous planning run while the Stock requirements list would not be accurate as it is always updated.
(C)   Stock requirements list are always created while MRP list are only created when exceptions occur.
(D)   The processing indicator in the MRP list is refreshed at each MRP run.
(E)   For each material, the MRP list planning file and the Stock Requirement list planning file each have its own planning indicators (NETCH< NETPL) as MRP list is static while Stock Requirements list is dynamic.

2 comments:

  1. MRP List is Static and S/R List is Dynamic. Therefore, the MRP List allows a planner to review the last Planning Run results without any biased.