In SAP MM/PP as at ECC6.0 EhP6, setting MRP1 data view in the Material Master to "ND" (No Planning), which of the other fields is mandatory in the MRP data views ?
(only one answer)
A) Lot Size Key.
B) Scheduling Margin Key.
C) Planned Delivery Time.
D) AV Check Group.
E) MRP Strategy.
.
Answer: C
In ECC with MRP Type "NB", only the Planned Delivery Time is Mandatory.
(only one answer)
A) Lot Size Key.
B) Scheduling Margin Key.
C) Planned Delivery Time.
D) AV Check Group.
E) MRP Strategy.
.
Answer: C
In ECC with MRP Type "NB", only the Planned Delivery Time is Mandatory.
In ECC with a valid MRP Type such as "PD" or "VB" etc:
Lot size is mandatory (MRP1)Procurement type is mandatory (MRP2)Planned Delivery time is mandatory (MRP2)Scheduling Margin key is mandatory (MRP2)