Question no 3821 : MRP Type BOM Explosion

In SAP MM/PP as at ECC6.0 EhP6, which of the following MRP Type do not have BOM Explosion ?

(more than one answers)

A)  "PD".
B)  "M0".
C)  "VB".
D)  "X0".
E)  "P1".
.

Answers: C, D

C) "VB" is Re-Order Point which has no BOM explosion as it is Consumption Based.
D) "X0" is created for APO material with no BOM Explosion in ERP.