In SAP MM/PP MRP as at ECC6.0 EhP6, which of the following are Correct about the MRP List ?
(more than one answers)
A) It has some Exception Messages different than of those in MD04.
B) It does not have a Refresh button.
C) Planned Orders cannot be converted to subsequent Documents.
D) It is possible to switch off Exception Messages to be generated into the MRP List.
E) The same Navigation Profile can be assigned to both MRP List and S/R List.
.
Answers: A, B, D, E
C) Both MRP List and S/R List can convert Planned Orders.
(more than one answers)
A) It has some Exception Messages different than of those in MD04.
B) It does not have a Refresh button.
C) Planned Orders cannot be converted to subsequent Documents.
D) It is possible to switch off Exception Messages to be generated into the MRP List.
E) The same Navigation Profile can be assigned to both MRP List and S/R List.
.
Answers: A, B, D, E
C) Both MRP List and S/R List can convert Planned Orders.
No comments: