This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, August 3, 2016

Question no 3226 : MRP Area

In SAP PP Planning for MRP Area as at ECC6.0 EhP6, which of the following setting or setups for MRP Area is not correct ?

(more than one answers)

A)  An MRP Area must be characterized as 5 alphanumeric or above.
B)  A Material master MRP data view can be enhanced with only one MRP Area.
C)  Scope of Planning can be used to sequence Planning by MRP Areas.
D)  Planning file entries is not updated for MRP Areas for a Material.
E)  MRP Area parameter in the Material Master do not allow MRP Strategy.
.

2 comments:

  1. A) 4 alphanumeric character is reserved for Plant.

    B, D) A Material Master can be enhanced with more than one MRP Area. When a material is enhanced at the MRP area with a valid MRP type, the system will create a Planning File Entry for it.

    C) You can define Scope of planning for MRP Area and Plant for MD01 and MDBT.

    E) MRP are parameter in the material master will not have Procurement Type, MRP Strategy, BOM Explosion (those from MRP3 and MRP4 data view in general).

    ReplyDelete

Note: Only a member of this blog may post a comment.