Question no 3237 : Measuring Point Transfer

In SAP PM as at ECC6.0 EhP6, which of the following is TRUE regarding measuring reading transfers from one measuring point to another measuring point when it is set with "Transfer generate  Interval documents" ?

(only one answer)

A)   Measuring doc is generated with only the net difference.
B)   One Measuring doc of the target measuring point is generated for each measuring doc from the source measuring point.
C)   Measuring doc is generated at specific intervals defined in the background job.
D)   Only One Measuring document for the target measuring point is to record for all subsequent measuring doc from the source measuring point.
E)   Only the net difference is generated into each Measuring doc for the target measuring point.
.

2 comments:

  1. "Transfer generate individual documents" will generate one document for the target measuring point for each measuring doc created at the source measuring point.

    "Transfer generate interval documents" will generate/update one document only at the target measuring point point even if multiple measuring docs are created at the source measuring point.

    ReplyDelete