In SAP PP or MM Planning as at ECC6.0 EhP6, review the following Dynamic Safety stock Profile, and calculate the Safety stock for period N.
Planned Independent Requirement
N 400
N+1 600
N+2 800
N+3 900
(only one answer)
A) 50
B) 100
C) 150
D) 200
E) 250
.
Answer: C
ReplyDelete((400+600+800)/(3x20)) x 5 = 150