Question no 1894 : Copying Functional Location

In SAP PM ECC6.0 EhP1, when copying an Functional Location to a new Functional Location, the user can decide to copy or not copy the following objects ?

(more then one answers)

A)    Document assignments.
B)    Permits.
C)    Construction Type.
D)    Equipment.
E)    Partner allocations.
.    

1 comment:

  1. Construction Type are always copied over and Equipment installation are unique.