Question no 1908 : Availability Check in Maintenance Order

In SAP PM ECC6.0, consider the following availability check setups, which are correct ?

(more then one answers)

A)    checking group is assign to the material master at plant level.
B)    checking rule is assign to the order type at plant level.
C)    the checking group and checking rule together specifies the scope of check.
D)    the inspection control can be set for at order creation time and at order release time.
E)    availability check can be executed automatically when saving an order.
.

1 comment:

  1. Refer to the following AV check setup:
    IMG - PM/CS - Maint/Serv Processing - Maint/Serv Orders - Functions and Settings for Order Types - Availability Check for Material, PRT, ... - ...

    except the AV check group which can be found in the PP configuration, other settings are done here.