Question no 1901 : PRT measuring Point in the Maitnenance Order

In SAP PM, the following characteristics depicts which scenario introduced in ECC6.0 EhP4 ?


.   Assign the Technical Object for each operations in the Maintenance Order.
.   Assign the related measuring point for the technical object in each operation to it via the PRT.
.   Record the measurement results in the "Overall Completion Confirmation" for each measuring point.

(only one answer)

A)     PRT assignment.
B)     Inspection Rounds.
C)     Measurement reading list.
D)     Object list entries.
E)     Object integration.
.

2 comments:

  1. Introduced in ECC6.0 EhP4, if you want to structure work as as an "Inspection Round" via a Maintenance Order, you can assign the technical object (Functional Location or Equipment) to the respective operations in the Maintenance Order. (one operation for each technical object) rather then using the object list.

    You can then assign the measuring point related to that technical object in the operation to the operation itself. This would allow you to pick up the measuring point at IW42 (overall confirmation) to perform the measuring reading entries.