In SAP S/4hANA Quality Management, Note the Inspection Lot with "APNG" (Approval not Granted) system status, and the Inspection Lot must be "Explicitly" set "Give Approval" to Release the Inspection Lot. What settings result in the below scenario ?
(only one answer)
A) User status was setup for the "Give Approval" requirement to the Inspection Lot.
B) It is a Standard feature in S/4.
C) "QM Material Authorization" Inspection lot approval requirement assigned to the Material Master
D) Inspection lot approval requirement in the Quality Control Key.
E) Inspection lot approval strategy in the Inspection type detail.
.
Answer: C
IMG > QM > Environment > Central Functions > Authorization Management > Define Authorization Groups and Digital Signature
Activities "Material Authorization Group Inspection Lot Approval, Digital Signature"
create a key for "QM mat.auth." (a 6 alphanumeric key)
set the field "ApprovalInspLot" to "2 no automatic approval for insp. with mat. specification"
next,
assign the new "QM mat.auth." key to the Material Master QM data view

No comments:
Post a Comment
Note: Only a member of this blog may post a comment.