In SAP PM as at ECC6.0 EhP6, which of the following functions are configurable via the "Control Key" assigned to the Operations ?
(more than one answers)
A) Print control.
B) Costing.
C) Capacity.
D) Scheduling.
E) Milestone Confirmation.
.
Answer: A, B, C, D
Except Milestone Confirmation.
(more than one answers)
A) Print control.
B) Costing.
C) Capacity.
D) Scheduling.
E) Milestone Confirmation.
.
Answer: A, B, C, D
Except Milestone Confirmation.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.