In SAP PM as at ECC6.0 EhP6, when materials are freely allowed to assign to the Task List, which of the following is correct ?
(only one answer)
A) An Assembly has been assigned to the Task List Header.
B) The Task List Profile assigned to the User allowed the assignment.
C) The material is a non-stock item.
D) The material entered must be an IBAU material type.
E) The system generates a Standard BOM Category "S" for these components.
.
Answer: E
First, the configuration must be set with (recommended usage "4"), then when you enter material freely to the task list operation, the system generates a BOM with Category "S". You cannot maintain this BOM via CS02 but can view it in table STPO.
(only one answer)
A) An Assembly has been assigned to the Task List Header.
B) The Task List Profile assigned to the User allowed the assignment.
C) The material is a non-stock item.
D) The material entered must be an IBAU material type.
E) The system generates a Standard BOM Category "S" for these components.
.
Answer: E
First, the configuration must be set with (recommended usage "4"), then when you enter material freely to the task list operation, the system generates a BOM with Category "S". You cannot maintain this BOM via CS02 but can view it in table STPO.