Question no 3563 : Free Assignment of Components

In SAP PM as at ECC6.0 EhP6, when materials are freely allowed to assign to the Task List, which of the following is correct ?

(only one answer)

A)  An Assembly has been assigned to the Task List Header.
B)  The Task List Profile assigned to the User allowed the assignment.
C)  The material is a non-stock item.
D)  The material entered must be an IBAU material type.
E)  The system generates a Standard BOM Category "S" for these components.
.

Answer: E

First, the configuration must be set with (recommended usage "4"), then when you enter material freely to the task list operation, the system generates a BOM with Category "S". You cannot maintain this BOM via CS02 but can view it in table STPO.