In SAP PP MRP as at ECC6.0 EhP6, which of the following controls the selection of BOM for MRP run ?
(only one answers)
A) Plant Parameter.
B) MRP Group Parameter.
C) Selection ID in the MRP 4 data view in the Material Master.
D) It always choose the BOM with usage "1".
E) None of the above.
.
Answer: A
Goto OPPQ, check "BOM/Routing Selection".
(only one answers)
A) Plant Parameter.
B) MRP Group Parameter.
C) Selection ID in the MRP 4 data view in the Material Master.
D) It always choose the BOM with usage "1".
E) None of the above.
.
Answer: A
Goto OPPQ, check "BOM/Routing Selection".