In SAP S/4, comparing transaction COCM to COCM1; which of the following processes are possible in COCM1 for the case of Configuration Material in the Make-to-Order scenario when the value assignments in the MTO Sales Orders are changed ?
A) Assign the Production Order to the Change Master.
B) Create Simulate Order.
C) Determine Changes.
D) Check Changes.
E) Change Original Order.
.
(only one answer)
Answer: A
Step 1: COCM
Link MTO Sales Order (with the Value assignment changes) to the MTO Production Order. (only available in COCM)
Step 2: COCM1
Create Simulate Order
Determine Changes.
Check Changes.
Change Original Order.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.