Question no 3899 : MRP Run using MD01

In SAP MM/PP as at ECC6.0 EhP6, which of the following features are Correctly described in MRP run via MD01 ?

(more than one answers)

A)  Scope of Plan is used to exclude a list of Materials from an MRP run.
B)  Plant and MRP Area can be sequenced using the Scope of Plan.
C)  Regenerative MRP run can be executed in MD01.
D)  User Exit Key allows you to filter Materials in the MRP run.
E)  Work Center Capacity version can be changed for an MRP run.
.

Answers: B, C, D

A, B) Scope of Plan is to sequence Plant and/or MRP area.
C) Regenerative, Net Change, and Net Change within Planning Horizon possible in MD01.
D) User Exit Key can be used for Material filtering in an MRP run.
E) You can switch Capacity version in Long Term Planning Scenario.