In SAP MM/PP MRP as at ECC6.0 EhP6, the push buttons available in the dialogue box of a Planned Order MRP Element is controlled by which of the following ?
(only one answer)
A) MRP Type.
B) MRP Group.
C) Procurement Type.
D) Scheduling Margin Key.
E) Plant Parameter.
.
Answer: C
The Procurement Type X, E, or F determines the push button that will be available in the dialogue box of a Planned Order MRP Element.
(only one answer)
A) MRP Type.
B) MRP Group.
C) Procurement Type.
D) Scheduling Margin Key.
E) Plant Parameter.
.
Answer: C
The Procurement Type X, E, or F determines the push button that will be available in the dialogue box of a Planned Order MRP Element.
The Material Type configuration decides the Material Master MRP2 view Procurement type field definition which will affect the Planned Order conversion possibilities.