In SAP PM as at ECC6.0 EhP6, which of the following are TRUE for the FICO aspects of Refurbishment Maintenance scenario ?
(more than one answers)
A) The settlement receiver is the Material Master.
B) Split valuation is expected of for the Material Master setup.
C) If the Pricing Control is "V", the Variances will be settled to the Material Master.
D) If the Pricing Control is "S", the Variances will be settled to the Expense Account.
E) A special Order Type with Refurbishment scenario is required.
.
Click "1 comment" for possible solution.
(more than one answers)
A) The settlement receiver is the Material Master.
B) Split valuation is expected of for the Material Master setup.
C) If the Pricing Control is "V", the Variances will be settled to the Material Master.
D) If the Pricing Control is "S", the Variances will be settled to the Expense Account.
E) A special Order Type with Refurbishment scenario is required.
.
Click "1 comment" for possible solution.
Answers: A, B, C, D, E
ReplyDeleteAll of the above.