In SAP PP, MM as at ECC6.0 EhP6, which of the default parameters is/are used to default the MRP Group in the Material Master MRP1 data view ?
(only one answer)
A) Material Type + Plant.
B) MRP Type + Plant.
C) Material Type + MRP Type + Plant.
D) Material Type.
E) Plant.
.
Answer: A
IMG - MM - CBP - MRP Groups - Define MRP Group for Each Material Type
IMG - PP - MRP - MRP Groups - Define MRP Group for Each Material Type
(only one answer)
A) Material Type + Plant.
B) MRP Type + Plant.
C) Material Type + MRP Type + Plant.
D) Material Type.
E) Plant.
.
Answer: A
IMG - MM - CBP - MRP Groups - Define MRP Group for Each Material Type
IMG - PP - MRP - MRP Groups - Define MRP Group for Each Material Type