Question no 3484 : Exclude or Include Reservations during MRP Run

In SAP MM Consumption Based Planning as at ECC6.0 EhP7, which of the following parameter is used to control the exclusion or inclusion of Reservations from the MRP Run ?

A)  Plant Parameter.
B)  MRP Group Parameter.
C)  MRP Type.
D)  MRP Profile.
E)  Planning File Entry.
.

Answer: C

IMG - MM - CBP - Master Data - Check MRP Types
review MRP Type "VB", review "Include ext. requirements" field.