In SAP MM Consumption Based Planning as at ECC6.0 EhP7, which of the following parameter is used to control the exclusion or inclusion of Reservations from the MRP Run ?
A) Plant Parameter.
B) MRP Group Parameter.
C) MRP Type.
D) MRP Profile.
E) Planning File Entry.
.
Answer: C
IMG - MM - CBP - Master Data - Check MRP Types
review MRP Type "VB", review "Include ext. requirements" field.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.