In SAP PM as at ECC6.0 EhP6, which of the following are features controlled by the Scheduling Parameter for an Order Type in Plant Maintenance ?
(more than one answers)
A) Consider or Ignore Break times.
B) Automatic Scheduling when Saving the Order.
C) Define the Scheduling Type.
D) Allow Start date in the Past.
E) Adjust Basic Date to Scheduled Dates.
.
Answer: A, B, C, D, E
OPU7
(more than one answers)
A) Consider or Ignore Break times.
B) Automatic Scheduling when Saving the Order.
C) Define the Scheduling Type.
D) Allow Start date in the Past.
E) Adjust Basic Date to Scheduled Dates.
.
Answer: A, B, C, D, E
OPU7