In SAP PM as at ECC6.0 EhP6, in which of the following status where Actual Overhead Calculation can be executed ?
(only one answer)
(A) Must be after TECO but before CLSD.
(B) Must be after REL but before CLSD.
(C) Can be at CRTD status but before TECO.
(D) As long as after TECO.
(E) As long as after REL.
.
Answer: B
Partial Settlement allows OH calculation at REL status as well after after TECO but must be done before the system status CLSD.